A redundant dockside tower crane was identified for removal by the client.

- The crane had stood dormant for a number of years and on pre dismantling inspection was found to be in worse structural condition than anticipated.

- A design proposal for the dismantling was developed by the O’Brien Team which addressed the safety risks arising from the structural condition of the crane.

- Three cranes were deployed to ensure that disconnections could be made both safely and effectively and the structure was successfully dismantled.



 