Neptune Yard, Wallsend

This site was closed in the early 1990’s and lay dormant for a number of years we were engaged to undertake the clearance of the site prior to it’s future redevelopment.

Works included but were not limited to  

- Dismantling/ demolition of nine dockside cranes

- Demolition of a number of large fabrication sheds and recycling of over 9000 tonne of steel.

- Removal of both non - notifiable and notifiable asbestos materials from buildings and structures on the site

- Removal of oils and other hazardous materials

- Demolition of all buildings and above ground structures on the site

- Removal of tanks and vessels


 