Food Ingredients Manufacturer Manchester

- The client was undertaking a major review of building requirements on site and we have worked with them proactively to assess initially the potential to fund demolitions through an asset recovery programme and then take work forward.

- This resulted in a successful partnership over an eighteen month period and delivered the demolition of major structures on the site including the former dextrose plant, FPL, Feed Mill and Wet Mill.
Works included ;

- Type 3 survey and identification of asbestos containing materials within buildings identified for demolition.

- Dismantling of silos and tanks and individual items of plant for salvage and reuse. This required planned crane lift under design implemented by the O’Brien Management Team.

- Identification and strip out of redundant pipe and cable lines.

- Controlled demolition of concrete silos.

- Controlled demolition of both reinforced concrete and steel frame process building structures.

- Erection of design scaffolds to facilitate the works on site.

- Crushing of all concrete and brickwork on site to 6f2 specification; this was used to fill voids resulting fro the demolition of structures and surface the site of former structures.

- The above works were carried out within a live starch production facility with an area of 42 acres and were completed to the client’s satisfaction without accident or incident.

 