Boldon School, New Road, Boldon, Tyne & Wear
Project consisted of:
- Site set up & security.
- Production of plans of work & environmental plans for each block
- Demolition of various blocks within the site including lifting of slabs & foundations.
- Protection of live services for duration of the works
- Asbestos removal including all loft spaces within the main block, AIB in CLASP buildings and over 200m of pipework insulation within the ducts.
- Removal of slates from our own scaffold access.
- Demolition of all blocks using x2 45 tonne excavators.
- All materials were removed from site using our own transport fleet for reprocessing at our local recycling centres.
- Over 95% of the building material were recycled at our own centres

![]()


![]()